Hi everyone:

The pool work is moving on schedule and we will have completed installation of the base layer above the liner by tomorrow. Following that will be the rough sloping for drainage and pavers with 75 tons of sand.

Next week our new pool heaters will be installed and the system put to a full test. Installation of French drains where required in our landscape areas will be dug and connected to the new drain system.

April 5th the pavers are scheduled for delivery onsite and a crew of 12 pavers and 6 laborers will be onsite for installation. It is anticipated it will take 15 working days or 3 weeks to complete installation. 

Re-installation of the surrounding landscape will then begin as well as installation of a new drip system for water conservation.

The open issue remaining is the waterline pool tiles and the plaster in the large pool and spa.
The soil engineer has told us that he does not want the large pool drained for at least two years for stabilization of the soil directly under the pool which we couldn't access.  We can drain the  spa at this time, but we are seeking some additional opinions to determine if the spa can wait two years for new plaster and tile. If it is capable, the we will hold off replacing the tile in the pools right now and replace them when we re-plaster the two pools in two years.

The advantage of doing that is we won't have seam between the new tiles and old plaster which greatly increases the risk of further leaks. The re-plaster and tile work will take approximately 3 weeks and the pool then has to undergo a special chemical start up procedure that takes two weeks. These projects will be started after the swim season in two years or very early in the New Year ( weather permitting ) with the goal of the pools
re-opening for spring break.

Weather and updates still pending does not permit me to give you an estimated opening date however, I hope to be able to announce a date toward the end of April. The board and Avalon Management thank everyone for their continued understanding while we complete the repairs required to provide a safe pool experience.

Comments are closed.

    RSS Feed

    Community News:

    Archives

    June 2022
    May 2022
    April 2022
    March 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    June 2021
    May 2021
    April 2021
    March 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    September 2014

    Picture
(951) 699-2918
The Avalon Management Group, Inc. Copyright 2021 ● All rights reserved  ●  Terms of Use ● Privacy Policy
Temecula HOA Management  ● Murrieta HOA Management  ● Menifee HOA Management  ● Lake Elsinore HOA Management  ● Corona HOA Management  ● Wildomar HOA Management  ● Perris HOA Management