Week 3 brings the conclusion of demolition of our pool decks, coping, tiles and skimmers. From now until mid week next week, trenching will be performed to run the new electrical conduit, security system conduit and add'l drains. In addition the new skimmers will be installed and the additional skimmer on the east side of the pool where oils previously built up will be added. Now that the plaster has been removed, we are able to inspect the cracks found in the jacuzzi and running along the same line into the large pool. The base of the jacuzzi is fine and thus the crack in the plaster was a surface crack. The large pool crack appears in the floor of the pool after removal of the plaster and the pool contractor will be inspecting today to provide a recommendation. So far we are on schedule and things look good, weather permitting.