As many of you may be aware, San Diego Gas & Electric (SDG&E) is proposing the Golden Pacific Powerlink Project, which includes a proposed route through the Temecula Valley.
Your Wolf Creek Board of Directors remains firmly opposed to the proposed project and supports the City of Temecula’s efforts to protect our community and surrounding open space.
We are sharing an email sent to Temecula City Council members by a concerned Temecula Valley resident. The email includes additional information, links, and two graphics regarding the proposed project and its potential impacts. The two graphics are included together in the attached file. We encourage you to take a few moments to review the information and learn more about the project.
Homeowners are also encouraged to visit the City of Temecula’s dedicated Powerlink webpage, which provides project information and updates:
https://www.temeculaca.gov/powerlinkcomments
Additional information, resources, and opportunities to show your support are available at:
https://savetemecula.org/
Please take the time to become informed about the proposed project and consider making your voice heard. Community participation is important as this project continues to move forward.
Thank you for your continued involvement and support of our community.
Sincerely,
Nick Mokhlessin
President
Wolf Creek Board of Directors
Email from Concerned Temecula Resident
“Dear Mayor Alexander and Councilman Kalfus;
We want to share our major concerns over the proposed Golden Pacific Powerlink (GPP) proposed path through Temecula as it proposes to transit the Temecula Creek (zoned "Open Space - Conservation") for a distance of at least 5 miles and impacting with electromagnetic frequency hazard / interference an area 500 meters either side of the towers.
First, let me introduce myself and my background. I'm a retired Marine Corps Lieutenant Colonel having spent 23 years on active service in the air and missile defense field. During that time, I spent extensive time in research, development, and operational units involving high power radar and communications systems that emit electromagnetic frequency energy (as well as dealing with the associated radio frequency hazards and safety considerations. Retiring in 1996, I joined Raytheon (initially in Massachusetts) where I worked on advanced radar and guided missile systems over the next 18 years. From 2003-2013, Raytheon assigned me as Director, Battlefield Radar Systems in Fullerton CA...managing US and 26 International users of some 450 Raytheon radar systems. Retiring from Raytheon, we have lived in the Temecula / Fallbrook area since 2010.
Based on data readily available, we've prepared the below graphics showing the proposed path and areas of impact to include the electromagnetic hazard zone. These are "to scale" and do not exaggerate either the visual nor environmental impact of the GPP proposal. Please note (in the top graphic viewing west to east) that along the proposed path are TWENTY-ONE 500 KV towers. I've estimated along the Temecula Creek zone from I-15 to Anza Road (based upon standard 900-1,500' separation of 500 KV towers)). This graphic also depicts just FIVE of the 21 EMF impact zones (as representative for EACH tower) to show the swath cutting through the community...and impacting some 5,000+ homes, apartments, and a wide range of businesses.
The bottom graphic (looking north to south from above the ridgeline running just above DePortola Road (in the vicinity near Rancho Christian School) shows the visual impact of tower spacing (as above specs) of just 12 (of the 21) towers (the left being proximity of Redhawk Community Park (Redhawk & Overland Trail); the right being in the Proximity of Pala Community Park (off Temecula Lane). While SDG&E may claim 12 towers (for this area) is high, I've estimated the shown spacing to account for the intervening roads and the irregular (not a straight line) nature of Temecula Creek that would have to be taken into consideration.
The Temecula Creek area is the ONLY contiguous open space (east-west) inside city limits and is the home of many endangered species that would be displaced or impacted severely by not only the operation of a 500 kilovolt power line but also the construction and maintenance of the system. High power transmission lines have been connected with the disruption of migration and nesting patterns as well as deaths by contact with high power lines. Please see: https://rctlma.org/western-riverside-county-mshcp-species-accounts-mammals.
In addition, higher rates of childhood leukemia and other impacts have been documented. Please refer to the Environmental Protection Agency report at: https://www.epa.gov/radtown/electric-and-magnetic-fields-power-lines.
The 500 KV power lines are NOT the smaller < 200kv) power lines depicted by SDGE that are only 25 meters high...but the massive (> 50 meters) 160-180 foot high power lines. Those lines will be within 200 meters of not only Temecula Creek Park but also Vail Ranch Middle School, Redhawk Community Park, and Pala Community Park. Those 500KV lines also are well within 500 meters of Rancho Christian School and Stanley Gardner Middle School. This impact area is estimated to contain over 4,500 homes and apartments plus over 1,000 businesses (retail, medical, etc.). In fact, during the May 12th ZOOM by SDG&E, one engineer mentioned the maximum tower height could be over 200 feet high.
Documentation shows that homes within 500 meters or eyesight of 500 KV power lines results in decreased home values ranging from 5% to 40%. I've cited the entire report for your reference but include the below short summary. For the entire 28 page report, see: https://headwaterseconomics.org/wp-content/uploads/MSTI_PropertyValues_FINAL.pdf
"500 kV power lines generally reduce the value of nearby residential properties by 2% to 40% (or more in extreme cases), with the impact highest for homes immediately adjacent to towers. The devaluation is primarily due to visual blight, noise, and fear of health risks. Impact often decreases with distance, typically becoming negligible beyond 500 feet."
This ~ 140 mile SDG&E power line does not even serve Riverside County nor any communities within the Greater Temecula Valley (all served by SoCal Edison). This project is also being opposed by the Anza-Borrego Foundation (see...https://theabf.org/park-threat/). That foundation is opposing GPP as another attempt by SDG&E to resurrect the Sunrise Powerlink project that proposed crossing Anza-Borrego Desert State Park that was defeated back in 2011.
SDG&E then ran not one but two power lines (one 500 KV plus one 260 KV) from El Centro along the southern US border (avoiding Anza-Borrego state park) terminating at a new substation in Alpine CA. Despite the spin SDG&E gave residents, the complaints from Alpine residents exploded in 2016 (see extract below or go to: https://www.10news.com/news/alpine-residents-outraged-over-sunrise-powerlink-emfs-and-possible-link-to-cancer-022316.
Parents and community members packed the auditorium at Alpine Elementary to express their outrage and frustration over electromagnetic fields coming from the Sunrise Powerlink. The Sunrise Powerlink is a high-voltage power transmission line by San Diego Gas & Electric in San Diego County and Imperial County. It went active in June 2012. Since then, the community says EMF levels have spiked.
As proposed, the Temecula and Anza-Borrego segments, the SDG&E's GPP effort (currently estimated at $2.3B) should NOT proceed.
SDG&E claims (in yesterday's ZOOM) going underground would increase the GPP cost by up to 10 times underground lines. However, SDG&E provides costs based upon the entire ~ 140 miles being underground vice just in populated or environmentally sensitive areas (such as the 5-mile run through Temecula). And, while overhead lines are cheaper initially ($1.5M-$3M per mile), underground lines are more resilient to storms but costlier ($10M-$20M per mile) to install. It seems going underground in certain areas...is wiser.
Using the midpoint in each overhead and underground costs, the impact of going underground in the ~ 5 mile Temecula Creek path...is less than 2% of the total project cost.
Please note that SDG&E's initial Sunrise Powerlink project was $700M (in 2006) and ended up at $1,900M ($1.9B) in 2010. The costs of Sunrise are to be covered by CA ratepayers (10% by SDG&E; 90% by SCE & PG&E)...but the total cost to ratepayers will now total over $3.3B.
One last comment regarding SDG&E's ZOOM presentation yesterday: During the presentation, the moderator stated she saw many questions being asked and stated they would address them later in the meeting. At that time, I opened both CHAT and QUESTION tabs and noticed that both were disabled until the very end of the presentation. Even then, it appeared to me that the entire Q&A section was pre-scripted by SDG&E to answer their own questions, not those of the community.
Thank you for your time and consideration. I hope this provides some additional reference points for your consideration. Temecula Valley is a wonderful area and I fear once the precedent is set and the conservation area violated...additional 500 KV lines will follow. I am available should you desire any additional information or assistance.”